Kansas City Power & Light Crosstown Pressurization Plant Placeholder image
Kansas City, MO

Kansas City Power & Light Crosstown Pressurization Plant

Project

Kansas City Power & Light Crosstown Pressurization Plant

Sector

Electric Utilities

Location

Kansas City, MO

Details

Part of Walker’s complete overhaul of KCP&L’s HPFF pressurization installations, the new Crosstown plant was the final and most important feature of KCP&L’s pipe-type system. Crosstown is a dual ladder, 6,000 gallon plant with PLC based controls.

HPFF Cable Monitoring Remote Terminal Units (RTUs) Placeholder image
Multiple Sites, New Jersey

HPFF Cable Monitoring Remote Terminal Units (RTUs)

Project

HPFF Cable Monitoring Remote Terminal Units (RTUs)

Sector

Networks, Integration & Automation / Electric Utilities

Location

Multiple Sites, New Jersey

Details

Walker was awarded multiple contracts for the design, build and commissioning of over 60 RTU systems. Walker’s RTUs are capable of monitoring current, voltage, temperature and cathodic protection rectifier operation for underground pipe-type transmission lines.

East River Bulk Nitrogen System Placeholder image
New York, NY

East River Bulk Nitrogen System

Project

East River Bulk Nitrogen System

Sector

Insulating Gases & Liquids / Electric Utilities

Location

New York, NY

Details

Turnkey project for the upgrade of the New York utilities East River Substation Nitrogen System included a 9,000 gallon nitrogen storage tank, vaporization system and multiple feeder pressure regulating cabinets.

Pump House Automation Placeholder image
Multiple Substations, New York City

Pump House Automation

Project

Pump House Automation

Sector

Networks, Integration & Automation / Electric Utilities

Location

Multiple Substations, New York City

Details

Walker was awarded a blanket order for the upgrade of HPFF pumping plant telecom infrastructure for a major Northeast electric utility. The project included the engineering, design, installation and commissioning of an automated system that transmits data including plant tank level readings to an internal server via a wireless modem installed in the plant.

20,000 Gallon Tank House Placeholder image
Astoria, NY

20,000 Gallon Tank House

Project

20,000 Gallon Tank House

Sector

Electric Utilities

Location

Astoria, NY

Details

Walker designed, fabricated, installed and commissioned a 20,000 gallon dielectric fluid facility with dispensing station to support the New York utilities HPFF transmission feeders. Working with the FDNY and NY DOB, Walker’s plant was approved for operation in 2022.

NJT Snow Melter Panels Placeholder image
Multiple Sites, New Jersey

NJT Snow Melter Panels

Project

NJT Snow Melter Panels

Sector

Electrified Transit

Location

Multiple Sites, New Jersey

Details

Walker teamed up with New Jersey Transit for the design of a updated Snow Melter Panel. Walker’s snow melter system is considered essential equipment for rail operation in Winter. Walker’s design has been vigorously tested against the strictest AREMA specifications including EMI, environmental and shock and vibration.

Circuit Breaker Interface (CBI) Devices Placeholder image
Multiple Sites, New York City

Circuit Breaker Interface (CBI) Devices

Project

Circuit Breaker Interface (CBI) Devices

Sector

Networks, Integration & Automation / Electric Utilities

Location

Multiple Sites, New York City

Details

Walker’s CBI panels allow seamless implementation of the IEC 61850 substation automation standard including digital tripping through ethernet via Generic Object Oriented Substation Events (GOOSE) messages as well as distributed automation through Manufacturing Message Specification (MMS) messages to limit external DC and AC wiring. The primary purpose of the CBI Cabinet is to operate the circuit breaker under automated / manual command and operate the circuit breaker disconnect switches.

Auxiliary Emergency Mobile Fire Pumps Placeholder image
Astoria, NY

Auxiliary Emergency Mobile Fire Pumps

Project

Auxiliary Emergency Mobile Fire Pumps

Sector

Electric Utilities / Insulating Gases & Liquids

Location

Astoria, NY

Details

As an emergency vendor on a critical project, Walker was asked to step in to design an emergency mobile fire pump system to be installed at Atoria’s LNG plant. Walker facilitated and complied with all FDNY and utility requirements and delivered a system that duplicates the flow and pressure of LNG’s fire protection system.

Advanced Metering Infrastructure (AMI) Expansion Boxes Placeholder image
Multiple Sites, New Jersey

Advanced Metering Infrastructure (AMI) Expansion Boxes

Project

Advanced Metering Infrastructure (AMI) Expansion Boxes

Sector

Networks, Integration & Automation / Electric Utilities

Location

Multiple Sites, New Jersey

Details

As part of New Jersey’s Clean Energy Program, Walker US supported the NJ utility on its AMI technology deployment – designing and building over 160 AMI Expansion Boxes. The AMI boxes communicate with the smart meters, creating an integrated communications network between the customer and the utility.